Kirkgate / Queensgate, Bradford

Another highly complex £2.0m structural engineering project for CDP on a confined city centre site to create modern multi-storey retail and leisure units. The original semi-derelict buildings were demolished except for the listed Queensgate façade which was retained and refurbished.
5 Rise Bingley

4Urban’s redevelopment of 5Rise Shopping & Library marked the start of the long overdue regeneration of retail facilities in Bingley town centre.
RJB Mining, Harworth

This project, completed in several phases, provided over 100,000sqft of HQ offices, warehousing and workshop facilities for RJB Mining, won with Miller Construction in a Design & Build competition.
Edison Park, Swindon

This high quality Business Park is located in a prominent position within one of the UK’s most thriving town economies.
Using a mix of prestigious B1 office buildings, Leehampton Developments and the Brookhouse Group are aiming to accommodate a range of blue chip clients within this quality development.
School of Excellence, Meadowhall

This 50,000 sq ft training facility was completed for Stadium Developments. Previous industrial use on the site necessitated extensive site reclamation and remediation before building works could start.
Midshires Building Society, Wolverhampton

A prestigious office building with reinforced concrete document storage basement and steel and composite superstructure.
Enterprise Centre, Chesterfield

The Northern Gateway scheme – includes an enterprise centre on the site of Holywell Cross (Donut) car park – due to open for business in early 2022.
As part of a wider regeneration plan this development opportunity included a public realm design that connects the Northern Gateway towards the historic Town Centre.
Rugby Club, Kendal

New facilities including a large clubhouse with changing rooms, gym, function rooms/bar, grandstand seating, along with full size natural turf and artificial pitches and two smaller training pitches.
Tortworth Court Hotel, Wotton-under-Edge

MJM were appointed by De Vere Hotels, part of Starwood Hotels, in 2015 to provide civil and structural engineering services for a £10m programme of refurbishment and renovations to this wonderful Victorian Grade 2* listed building which were completed in 2018.
Martins Bank, Liverpool

MJM have been appointed by Principal Hotels as civil and structural engineer for the due diligence process prior to acquisition and then for the various engineering works required to convert this unique Grade 2* former bank headquarters into the city’s first 5* hotel close to the Liverpool waterfront world heritage site.