Mixed Use Development, Leicester

Client: Maple Oak
Services Provided: Civil & Structural

28 storey residential, student accommodation, and mixed commercial development with multi-level basement carparking. Detailed design carried out and full tender drawings prepared for developer/contractor. RC Tunnel Form construction assessed in detail prior to opting for structural steel frame with rc cores and transfer slab at first floor supported on a reinforced concrete frame to basement. Piled and basement raft foundation.

Category: Residential

Case Study

Living Well, Bicton

New £3m residential care living well centre for Severn Hospice. Complex SUDS drainage techniques were designed including porous paving, swales

Read More