GLP Bike Ride 2021

GLP Bike Ride 2021

The MJM team put a solid effort in at the GLP bike ride again this year. Some members of the team even had time to shower and change before everyone finished! The ice cream and pizza was enjoyed by all.

A big thank you to GLP and all the sponsors for organising another excellent day.

Related Posts

Little Hulton MJM Case Study

Distribution Warehouse, Bolton

MJM provided civil and structural engineering for a new 330,000 sq ft distribution warehouse at Little Hulton, Bolton. The £23 million scheme replaced an existing warehouse on a steep site with basements, asbestos and retaining walls. The site presented several ground-related constraints and optimising the groundworks was critical.

Read More
Northampton School MJM Case Study

School Redevelopment, Leicestershire

MJM provided structural engineering for a new 1,200-place secondary school in Northampton. The project was the first operational use of the Seismic platform-based construction system, which MJM helped develop. The main teaching areas use 210 factory-made modules, while a hybrid structure provides the larger spans needed for the halls.

Read More