Regional Distribution Centre, London

Lidl Belevederea Distribution Centre MJM Case Study
Lidl Belevederea Distribution Centre MJM Case Study

Project: Regional Distribution Centre, London 
Services Provided: Civil & Structural Engineering, Geotechnical, Environmental, Highway Works, Drainage

MJM provided civil and structural engineering for a £82 million project, 400,000 sq ft Regional Distribution Centre at Belvedere on the bank of the Thames.

The former factory site had contaminated ground, poor near-surface soils and historic underground tunnels, while levels also needed raising for flood risk. MJM designed a fully piled building and bridging structures to carry loads around the tunnels without removing them.

The team also led the highways design, working with Highways England and the Local Authority to secure approvals and connect the site to the road network.

Category: Retail, Logistics & Industrial

Case Study

Tesco, Leicester

A new timber framed Tesco Store constructed on this prominent site near Leicester City Centre. The site had many challenges

Read More