Hazlewood Foods, Hull

Client: Miller Construction
Services Provided: Civil & Structural

This bakery commenced production in March 2001 and at £14.0m and 263,000 sq. ft. is the largest facility in Europe. The fastrack design and build programme with Miller Construction was completed on time and to budget overcoming adverse weather and ground conditions to produce an extremely cost effective building.

Category: Logistics & Industrial

Case Study

Littlebrook, Dartford

Client: BericoteServices Provided: Civil & Structural The site of the former Littlebrook power stations, adjacent to the Elizabeth Crossing at

Read More
Case Study

G-Park, Bedford

Provision of 3 industrial units for GLP totalling over 550,000 sq ft. All 3 buildings are 17m high and incorporate

Read More