It’s not all about the work!

We had a wonderful evening team building with a hotly contested bowling match followed by an Italian meal.

Our newest recruit and youngest team member, Tom, managed to steal a win on the last few bowls. Great to spend some time with everyone out of the office.

Related Posts

Little Hulton MJM Case Study

Distribution Warehouse, Bolton

MJM provided civil and structural engineering for a new 330,000 sq ft distribution warehouse at Little Hulton, Bolton. The £23 million scheme replaced an existing warehouse on a steep site with basements, asbestos and retaining walls. The site presented several ground-related constraints and optimising the groundworks was critical.

Read More
Northampton School MJM Case Study

School Redevelopment, Leicestershire

MJM provided structural engineering for a new 1,200-place secondary school in Northampton. The project was the first operational use of the Seismic platform-based construction system, which MJM helped develop. The main teaching areas use 210 factory-made modules, while a hybrid structure provides the larger spans needed for the halls.

Read More