Yorkshire Three Peaks

Last weekend, Team MJM successfully battled with the elements to complete the Yorkshire Three Peaks. 24 miles and 5,200ft of ascent in under 10 hours.

The team has raised over £1,000 so far, for  Martin House, but there is still plenty of time to donate via our  JustGiving page  if you haven’t already. Many thanks to everyone who has already donated.

Related Posts

Little Hulton MJM Case Study

Distribution Warehouse, Bolton

MJM provided civil and structural engineering for a new 330,000 sq ft distribution warehouse at Little Hulton, Bolton. The £23 million scheme replaced an existing warehouse on a steep site with basements, asbestos and retaining walls. The site presented several ground-related constraints and optimising the groundworks was critical.

Read More
Northampton School MJM Case Study

School Redevelopment, Leicestershire

MJM provided structural engineering for a new 1,200-place secondary school in Northampton. The project was the first operational use of the Seismic platform-based construction system, which MJM helped develop. The main teaching areas use 210 factory-made modules, while a hybrid structure provides the larger spans needed for the halls.

Read More