Territorial Army Centre, Bootle

3 storey TA centre comprising accommodation, offices, sports hall, armoury and rifle range. In addition, there was a vehicle maintenance garage and separate cadet training centre. Robust slabs (both external an internal to the garage) were required due to the type of vehicles used by the MOD. The design of a particular elevation had to accommodate the potential for terrorist attack.

Primary Healthcare Centre, East Leeds

Primary Healthcare Centre, East Leeds Three storey steel framed medical facility replacing an existing centre completed as part of our partnership within the NHS Leeds LIFT projects.

Leeds Bradford International Airport

The £7.0m third phase of the re-development of the airport was completed to provide new international arrivals and baggage handling facilities together with a new elevated airside walkway linking to the earlier Phases I and II departure facilities.

Primary Healthcare Centre, Lower Wortley Leeds

Four storey steel framed medical facility with complex envelope on a restricted site. The building was required to present a striking landmark and to accommodate the latest medical innovations as well as being energy efficient. The site is bounded by a main river and the works included extensive piling, bank retention and flood protection.

Stephenson College, Coalville

Construction of a new adult education college to replace the existing Victorian town centre building. The site required extensive reclamation and earthworks before construction could commence. The project was won in a Design & Build competition with Mowlem Building and required extensive value engineering of previous proposals which were economically non-viable.

British Library, Boston Spa

British Library Boston Spa

Client: AllenbuildServices Provided: Civil & Structural A £22m project for the British Library which provided a ‘world first’ archive facility at their Boston Spa Site in Yorkshire. The building is 80m long, 50m wide and 21m high and provides 262.5 linear kilometres of fully automated storage space. 100,000 m3 of earth was excavated to ensure […]