3 storey TA centre comprising accommodation, offices, sports hall, armoury and rifle range. In addition, there was a vehicle maintenance garage and separate cadet training centre. Robust slabs (both external an internal to the garage) were required due to the type of vehicles used by the MOD. The design of a particular elevation had to accommodate the potential for terrorist attack.